Brisbane Distribution Centre
Yatala, QLD

- Year
- 2022
- Duration
- 7 months
- Volume
- 64,000 m³
- Length
- 2.4 km
01
The problem
A logistics hub needed a 12-hectare hardstand and conduit network ready for a fixed tenant move-in date. Soft ground under the pad failed first proof roll.
02
The solution
We boxed out the soft zones, placed a geotextile-wrapped rock bridging layer and built the pad back with select fill. Power and comms conduits went in during the same pass.
03
The result
Hardstand passed proof roll and plate load tests first time. Tenant moved in on the original date.